 DSC/KyTC Partnership, Double Stone-Arch Culvert Repair - Jessamine Co, KY. March 2007. 

Wilmore Culvert, November 7, 2006. Before.
Wilmore Culvert, November 7, 2006. Before.
Viewed: 1683 times.

Wilmore Culvert, November 7, 2006. Before.
Wilmore Culvert, November 7, 2006. Before.
Viewed: 1936 times.

Wilmore Culvert, November 17, 2006. Before.
Wilmore Culvert, November 17, 2006. Before.
Viewed: 1821 times.

Wilmore Culvert, November 17, 2006. Before.
Wilmore Culvert, November 17, 2006. Before.
Viewed: 1556 times.

Wilmore Culvert, January 21, 2005, showing the downstream end of one of the culvert barrel vaults.  Notice original 18th C vertical dry-laid abutments (presumably for a timber span bridge) and the later mid 19th C addition of the stone arch vault.
Wilmore Culvert, January 21, 2005, showing the downstream end of one of the culvert barrel vaults. Notice original 18th C vertical dry-laid abutments (presumably for a timber span bridge) and the later mid 19th C addition of the stone arch vault.
Viewed: 1618 times.

Wilmore Culvert, showing underneath with the original 18th C dry-laid abutment and later stone vault addition.
Wilmore Culvert, showing underneath with the original 18th C dry-laid abutment and later stone vault addition.
Viewed: 1552 times.

Wilmore Culvert, showing the second barrel/vault at the downstream end.  Notice the original 18th C vertical dry-laid abutments and later stone arch vault.
Wilmore Culvert, showing the second barrel/vault at the downstream end. Notice the original 18th C vertical dry-laid abutments and later stone arch vault.
Viewed: 1552 times.

Wilmore Culvert, showing underneath the second barrel/vault.
Wilmore Culvert, showing underneath the second barrel/vault.
Viewed: 1562 times.

Wilmore Culvert, November 20, 2006. Day 1. South vault dismantled.
Wilmore Culvert, November 20, 2006. Day 1. South vault dismantled.
Viewed: 1447 times.

Wilmore Culvert, November 20, 2006. Day 1. South vault dismantled, north vault uncovered.
Wilmore Culvert, November 20, 2006. Day 1. South vault dismantled, north vault uncovered.
Viewed: 1439 times.

Wilmore Culvert, November 20, 2006. Day 1 on site. Removing the early 20th C addition of poor quality stonework that was added to accommodate a wider roadway, exposing the upstream end of the earlier 19th C stone arch vaults.
Wilmore Culvert, November 20, 2006. Day 1 on site. Removing the early 20th C addition of poor quality stonework that was added to accommodate a wider roadway, exposing the upstream end of the earlier 19th C stone arch vaults.
Viewed: 1596 times.

Wilmore Culvert, November 20, 2006. Day 1 on site. South vault, upstream end of the earlier 19th C stone arch vault.
Wilmore Culvert, November 20, 2006. Day 1 on site. South vault, upstream end of the earlier 19th C stone arch vault.
Viewed: 1629 times.