 Wall on the other side of the steps. 

I'm just getting started, working on the foundation stones.
I'm just getting started, working on the foundation stones.
Viewed: 560 times.

This wall has a nice gradual curve to it.
This wall has a nice gradual curve to it.
Viewed: 517 times.

Preparations have begun on the arch covered "cubby hole".
Preparations have begun on the arch covered "cubby hole".
Viewed: 495 times.

I still have another 20 feet or so to go around the left corner.  The end is in sight!
I still have another 20 feet or so to go around the left corner. The end is in sight!
Viewed: 418 times.

Gravity and friction doing their job!
Gravity and friction doing their job!
Viewed: 495 times.

This retaining wall is finally ready for the coping and or capstones.
This retaining wall is finally ready for the coping and or capstones.
Viewed: 398 times.

The taller section of this wall is  capped off with large flat stones to minimize the overall height of the wall.
The taller section of this wall is capped off with large flat stones to minimize the overall height of the wall.
Viewed: 401 times.

The lower section is finished off with traditional coping from this point and around the corner.
The lower section is finished off with traditional coping from this point and around the corner.
Viewed: 401 times.